Actual room before with junk in the middle:
Kim fell in love with a bedding set from pottery barn kids and designed the room around it. We ended up choosing 4' bead board wainscoting with a sky blue paint color above.
The first thing I did was paint the oak trim white as I have in every other room we touched. I also replaced the bedroom door with a solid core six panel mdf door. The oak veneer closet doors were also changed out to hollow core six panel doors. I also replaced all the tan receptacles and covers with white ones.
Here are some progress photos:
Completed pics:
Kim found the tree on etsy I believe along with the chalk board owl cling. Kim and her mom also mad the awesome window treatments with items from Michaels or Jo Annes.
The wainscoting was very easy to install. We bought 4x8 sheets of the board at Home Depot and had them cut the sheets in half. To tack the panels in place we used white panel board nails and liquid nails adhesive. Honestly the adhesive was worthless. Once the boards were in place we painted them and used a nail gun to install the top rail and base. Total cost for the bead board was about $120. In the end I think it turned out great. Kim and her mom did a great job decorating.
Back to the basement. It's been a few weeks since I have posted progress photos. I have been focusing on the rough in plumbing for the bathroom and finishing the metal stud walls. Plumbing photos:
As you can see in the first photo we (Kevin and I) thought the existing drain went one way but realized after about 45 mins of labor it went another direction. The top photo shows the trench for the shower drain on the left. The middle picture shows the trench for the toilet and vent. The bottom picture shows the corner where the vanity will sit. We used a circular saw with a diamond blade to score the concrete. Since the saw made too much dust we ended up just using an 8lb sledge to break up the concrete. The lines aren't as pretty or straight but I figure the flooring will cover up the patched concrete slab. A smaller hammer was used to break up the concrete near the pipe. We used 5 gallon buckets to remove the broken up material from the basement.
Planned fixtures:
I found the shower glass and base at overstock.com and the vanity/mirror was bought at home depot. I still have not decided on flooring or shower tile materials. I'm leaning towards cork flooring and glass tile for the shower.
Okay back to the progress:
I have finished all the steel stud walls with the exception of two bathroom walls. I have not fastened all the studs to the track yet either. I have also begun installing the wood framing where the doors will go. I ended up buying solid pre-hung MDF 6 panel doors from Home Depot when they were on sale for the same price as hollow pre-hung doors.
Framing around the mechanicals.
Future bedroom closet - still need to install the closet studs.
bedroom/ play area
hall way to bathroom (on left) and laundry room
You can finally start making out the different areas of the basement. The last picture shows the stair nook outline. In the next couple of weeks I would like to complete the actual plumbing rough in, patch the concrete slab, finish all the steel studs, and paint the ceiling grey. Lots to do!!!! Thanks for reading.
No comments:
Post a Comment